Ashdale Secondary College - Autism Centre

Project Name: Ashdale Secondary College – Autism Centre

Client: Building Management and Works

Project Value: $345,530

Project Description:

The works at Ashdale Secondary College comprised of the construction of a new classroom to be used by the school’s autistic school community, together with additional staff study to accommodate teachers and support staff.

The works included:

  • Clearing of existing vegetation.
  • New concrete slab & footings.
  • Hydraulic services works included installation of new soakwells, sewer and water pipework, stormwater services and kitchen fixtures.
  • Electrical services works included installation of new electrical wiring, lighting, data and powerpoints.
  • Mechanical service works included installation of new ductwork, mechanical units, refrigeration pipework.
  • New masonry block walls.
  • Supply, fabrication and installation of structural steel.
  • Supply and installation of new roof sheeting with associated safety mesh, gutters and flashings.
  • Internal fitout – New cabinetry, floor coverings, tiling, ceilings and glazing.